The key to success of Critical Path is the stength of its color range, that breaks the space turning it into main protagonist.
Excellent equilibrated logo blunt with thin line.
It can be recognized by its great balance, exclusiveness and formal excellence.
Critical Path is surely a promising candidate between classic logos, due to its accuracy in terms of weight and shapes.
The logo Critical Path Is executed in such a precise way that including it in any place will never result a problem.
Critical Path is a perfect sample of how a logo turns up to be a clear distinctive of its brand.